The Pilot
First, we had to determine how the new MES should communicate with the Oracle ERP and which one should be considered as the ultimate source of truth. The production loop generally consisted of the following actions/events:
ERP says what should be produced → MES manages what happens on the shop floor → MES reports what was done back to the ERP (in detail)
At the time, it depended on a paper/manual reconciliation process between the shop floor, planning, and ERP, which made it slow and often unreliable. By establishing an automated bidirectional information flow between the ERP and the MES, the production loop was closed, making planning and execution work together quickly and reliably. Information was now available within minutes rather than weeks.
We developed a connectivity layer that allowed work orders to flow from Oracle into MES, where production teams could work with them directly on the shop floor. Material and inventory movements could be tracked digitally, while produced quantities, rejects, scrap, and other relevant production information could be reported back to the ERP. The operators could interact with the system through a single easy-to-use interface. For example, defective pieces and reasons for rejection could now be reported directly on the screens instead of relying on a lengthy and messy paper process. The system was now able to handle custom work orders that helped keep production smooth at all times.
The end goal was that production operates as one connected workflow – planning, material movement, production execution, and reporting moving as one. This is where the pilot moved beyond just being a pilot. It shaped up to be a strong and reliable digital foundation that could handle Ballard’s plans for expansion both in function and scale.
From pilot to platform through iterative development
Once the information was moving properly between the ERP and production, other fragmented workflows became visible. This is where our collaboration started to evolve from an integration project into a long-term development partnership. Over the following years, Ballard brought real production problems to the team rather than asking for generic MES modules. Where standard AVEVA functionalities fit, we used them. Where they didn’t, we adapted them or built something better suited to Ballard’s process.
That process was highly iterative. Ballard’s operations team would define a requirement, we would model and implement it, and the solution would be reviewed and adjusted before reaching production. The system therefore grew alongside Ballard’s manufacturing needs rather than following a predefined feature roadmap.
As the system expanded, we came across increasingly complex requirements and workflows – ones where basic out-of-the-box functionality wasn’t enough. A great example of this was the stack assembly/rework module. If testing identifies a problem inside an assembled stack, the affected component can be removed and replaced rather than discarding or treating the entire assembly as a whole. The MES therefore must retain the genealogy of the stack, record what was removed and what replaced it, and continue tracking the revised assembly through testing and subsequent production steps.
Stack assembly and rework became one of the more complex examples, but far from the only one. Over time, the MES expanded to support the following areas of Ballard’s production (in no particular order):
ERP-connected work order execution
Work orders are retrieved from the Oracle ERP directly into the MES. Production status, produced quantities, and other relevant information are then returned to the ERP in batches. Operators can now execute production directly from the MES instead of repeatedly moving manually between the two systems. Production information that previously required more than a week to synchronize gets there immediately or within minutes.
Production reporting
The MES now records produced quantities and communicates the results back towards the ERP. Operators can also digitally report good quantities, , and reasons for rejection. This completely replaced parts of the former manual paper workflow, now giving production and planning systems much faster visibility into actual output and losses.